1.
What is an electrical schedule?

2.
Which among the following information is required for a good estimation? i. Availability of products ii. Sources of production, vendor selection iii. New products and their quality iv. Prices and the discounts provided for each product

3.
What is meant by contingencies?

4.
Which among the following mode of tendering is used by purchase department? i. Open tendering ii. Limited tender iii. Spot tendering iv. Global tendering v. Proprietary tender

5.
What is meant by petty purchase?

6.
What is the maximum number of lighting points that can be connected in a circuit?

7.
What is the maximum load that can be connected in a circuit connecting only lighting points?

8.
Which among these is a method of wiring?

9.
For what voltage levels are the screwed conduit circuits used?

10.
Which material is used for wiring continuous bus bar?